MERIDIAN TOWNSHIP - Currently, the outer lane of southbound Okemos Road between Hamilton and Mount Hope Roads has been closed since November. A decision made by the Ingham County Road Department (IRCD) after their bi-annual bridge inspection.
The inspection revealed that the bridge is deteriorated to the point where heavy vehicle traffic needs to be restricted. The repair work will begin in early March, weather permitted, and is expected to be completed by early June.
"During the actual construction work we are going to need to close both lanes of the bridge, right now just the outer southbound lane is closed to keep heavy truck traffic off that outer lane. During the repair work we are going to be working on the whole bridge and both southbound lanes will be closed," says Bill Conklin, Manager of the ICRD.
Motorists will be instructed to take a detour from Mount Hope Road to Hagadorn Road and North Grand River Ave in order to get back to Okemos Road. Conklin expects this detour to add 10 to 15 minutes to total trip time depending on traffic conditions.
The ICRD set a low bid of $250,000.00 for the repair work but that price could fluctuate based on quantities since it is a unit-price bid. Conklin says this is just one of many construction projects Okemos Road will see in the future.
"The repair work will keep the bridge surface-able for a 5 to 10-year timeframe in which then we will apply for a larger grant to fully replace both the Northbound and Southbound bridges with one bridge that will carry four lanes of traffic," says Conklin.